A SMALL WORKSHOP IN MAKING THINGS SMOOTH
WarmwayThe Little Paving Yard
A little heat. A little patience.
A very satisfying finish.
OPEN STUDIO 2.4 × 1.6 m · a close-up patch of road
THE PRACTICE PATCH DRAG TO WORK
HEAT CLOCK PAUSED
← 2.4 metres →
LAID AREA0 %of the whole yard
MEAN DENSITY—of the top course
SURFACE HEAT—hot mix rolls best
MEAN THICKNESS—solid + air
CROSS-SECTION0.80 m
Choose Paver, drag across the dashed practice patch, then roll back and forth.